# Unlinking a Spreadsheet

To disconnect a Google Sheets spreadsheet from Boldmaper, you can do the following:

* Go to your map's location sync settings (**Settings > Location Sync**), and click on the **Unlink Spreadsheet** button.
* In your Google Sheets spreadsheet, you can now remove **boldmapper-sync** as a collaborator (click **Share > boldmapper-sync > Remove**).

Once removed, Boldmapper will no longer sync the map's locations to that spreadsheet. You can always [connect another spreadsheet](/location-management/sync-with-google-sheets/getting-started.md) to your map in the future if needed.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.boldmapper.com/location-management/sync-with-google-sheets/unlinking-a-spreadsheet.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
